Water Of Leith Bridge
38 Tonnes
HML Engineering were responsible for the fabrication of the structural steel used on the Water of Leith Bridge. Measuring in at 21.5M tall and 5.8M wide the end tower was a remarkable statement of our workmanship.
Water Of Leith Bridge
HML Engineering were responsible for the fabrication of the structural steel used on the Water of Leith Bridge. Measuring in at 21.5M tall and 5.8M wide the end tower was a remarkable statement of our workmanship.