Babich Winery
121 Tonnes
HML Engineering were responsible for the structural steel fabrication and installation for the recently completed Babich winery. This project was originally 100 tonne and had a canopy added during the project. HML Engineering adapted quickly to the extra steel required for fabrication and install and delivered the project ontime.