Nelson Forest Kaituna Saw Deck
30 Tonnes
HML Engineering undertook the new saw deck project in 2010. This job presented a few challenges, with the fabrication being required at our site in Blenheim and then transporting the 10mtr wide load to site for installation.
This saw deck was retrofitted into the existing sawmill and presented further challenges due to the tight confines of the site. Despite these challenges HML Engineering delivered on time and within budget.