Yealand’s Marc Building

59 Tonne

HML Engineering was responsible for the structural steel fabrication and installation for the new Yealand’s Marc Building completed in 2019. With a total of 51 tonne of steel HML was able to quickly fabricate and install the structural steel for the building.

Image gallery

Considering a project?

No project is too big for the HML Engineering team.
Talk to us early. We will help you get the quality you want, when you need it.